Committed to serving your needs.
Below are the list of our project details of all our local assets:
Segari Power Plant
Capacity
-
Generating capacity of 1,303 MW; effective capacity of 1,222 MW
Ownership
-
Co-owned by Malakoff (93.75%) and Employees Provident Fund (6.25%)
Location
-
Perak, Malaysia
Commencement date
-
July 1996 (first block) and January 1997 (second block)
Plant description
-
Two blocks of Combined Cycle Gas Turbine (CCGT) each with a capacity of 651.5 MW
-
Three Alstom Power gas turbines and one steam turbine per block
Offtaker
-
21-year PPA with TNB with a 10-year extension
Fuel supply
-
Natural gas supply contract with PETRONAS that matches life of PPA
Fuel type
-
Gas
O&M
-
Provided by wholly-owned subsidiary, M Power
PPA Expiration
-
2027
Kapar Power Plant
Capacity
-
Generating capacity of 2,220 MW; effective capacity of 880 MW
Ownership
-
Kapar Energy Ventures Sdn. Bhd., which is co-owned by Malakoff (40%) and TNB (60%)
Location
-
Selangor, Malaysia
Commencement date
-
October 1985 and August 1986 (first phase)
-
December 1988 and July 1989 (second phase)
-
April 2001 and June 2001 (third phase)
-
December 1995 and January 1996 (fourth phase)
Plant description
-
Four phases
-
GE, GE Nuovo Pignone and Mitsubishi Heavy Industries turbines
Offtaker
-
25-year PPA with TNB
Fuel supply
-
Coal and MFO are purchased pursuant to a supply agreement with TFS
-
Natural gas is purchased pursuant to a supply agreement with TNB as set forth in the KEV PPA
-
Distillate oil is purchased pursuant to spot market
Fuel type
-
Coal, oil, gas
O&M
-
Kapar Energy Ventures Sdn. Bhd.
PPA Expiration
-
2029
GB3 Power Plant
Capacity
-
Generating capacity of 640 MW; effective capacity of 480 MW
Ownership
-
Co-owned by Malakoff (75%), TNB (20%) and Employees Provident Fund (5%)
Location
-
Perak, Malaysia
Commencement date
-
December 2001 as OCGT and converted to CCGT in November 2002
Plant description
-
One block of Combined Cycle Gas Turbine (CCGT) with a capacity of 640 MW
-
Three Alstom Power gas turbines and one steam turbine
Offtaker
-
21-year PPA with TNB
Fuel supply
-
Natural gas contract with PETRONAS that matches life of PPA
Fuel type
-
Gas
O&M
-
Provided by wholly-owned subsidiary, M Power
PPA Expiration
-
2022
*PPA has already expired
Prai Power Plant
Capacity
-
Generating and effective capacity of 350 MW
Ownership
-
100% owned by Malakoff
Location
-
Pulau Pinang, Malaysia
Commencement date
-
June 2003
Plant description
-
One block of single shaft combine cycle with a capacity of 350 MW
-
One GE gas turbine and one steam turbine
Offtaker
-
21-year PPA with TNB
Fuel supply
-
Natural gas supply contact with PETRONAS that matches life of PPA
Fuel type
-
Gas
O&M
-
Provided by wholly-owned subsidiary, M Power
PPA Expiration
-
2024
Tanjung Bin Power Plant
Capacity
-
Generating capacity of 2,100 MW; effective capacity of 1,890 MW
Ownership
-
Co-owned by Malakoff (90%) and Employees Provident Fund (10%)
Location
-
Johor, Malaysia
Commencement date
-
September 2006 (first unit), February 2007 (second unit), August 2007 (third unit)
Plant description
-
Sub-critical coal fired power plant with three units of IHI pulverised coal boiler and three units of Toshiba steam turbines
Offtaker
-
25-year PPA with TNB
Fuel supply
-
Coal supply contact with TNB Fuel Services that matches life of PPA
Fuel type
-
Coal
O&M
-
Provided by wholly-owned subsidiary, M Power
PPA Expiration
-
2031
Tanjung Bin Energy Power Plant
Capacity
-
Generating and effective capacity of 1,000 MW
Ownership
-
100% owned by Malakoff
Location
-
Johor, Malaysia
Commencement date
-
21 March 2016
Plant description
-
Ultra supercritical coal fired power plant
Offtaker
-
25-year PPA with TNB
Fuel supply
-
Coal supply contract with TNB Fuel Services that matches life of PPA
Fuel type
-
Coal
O&M
-
Provided by wholly-owned subsidiary, M Power
PPA Expiration
-
2041
Port Dickson Power Plant
Capacity
-
Generating and effective capacity of 436 MW
Ownership
-
100% owned by Malakoff
Location
-
Negeri Sembilan, Malaysia
Commencement date
-
January 1995
Plant description
-
Four units of GE Open Cycle Gas Turbines (OCGT)
Offtaker
-
21-year PPA with TNB with a 3 year extension
Fuel supply
-
Natural gas contract with PETRONAS that matches life of PPA
Fuel type
-
Gas
O&M
-
Provided by wholly-owned subsidiary, M Power
PPA Expiration
-
2019
*PPA has already expired