Project Management Services Portfolio

Incorporated in 1996, Malakoff Engineering Sdn. Bhd. (“MESB”) is a wholly-owned subsidiary by Malakoff Corporation Berhad ("Malakoff"). MESB is the Malakoff project management arm that provides project management services for in-house projects.

MESB has a proven track record of 24 years including in power plant development projects such as Open Cycle Gas Turbine (“OCGT”), Combine Cycle Gas Turbine (“CCGT”), Coal-Fired Power Plant, Electricity Distribution System & Chilled Water System and Large Scale Solar Plant (“LSSP”).

Services

Design Review​

Providing consultation in the review of detailed engineering and designs for all aspects of Mechanical & Electrical ("M&E") and Civil & Structural ("C&S"), ​as well as adherence to practices as per codes and standard. ​

Design is evaluated thoroughly to ensure that design requirements and specifications set forth by the client are met, fully functional and can be adequately maintained for a minimum and predetermined period of time​.

Erection & Installation​

Provide and manage the coordination, supervision and management of the erection and installation activities from start until completion of works via highly technical staff. The project team lead by the Project Manager will ensure appropriate HSSE, QA/QC policies and procedures are applied throughout the project.​

Testing & Commissioning​

Offers wide range of full system review and monitoring of testing and commissioning, carried out by our technical engineers. ​

Our testing & commissioning capability caters across your power assets, including:​

  • Water & Steam Cycle​

  • Balance of Plant Equipment​

  • Environmental Control System ("ECS")​

  • Coal Handling System​

  • Electrical & Instrumentation System​

  • Operability Review​​​

Pre & Post Project Construction​

Assist project owner during the development of projects such as technical review of tender document and EPCC contract negotiations.​

Support asset owner and operation team during the warranty period upon project completion. Ensure the punch list items and defect rectification works are executed in accordance to the standard and completed in a timely manner without affecting plant operation.​

No
Project Details
Location
Capacity
Period
1

GB3 Lumut Power Plant Project

i. Power Block

ii. Substation and Interconnection Facilities

Lumut, Perak

480 MW

Open Cycle – 

Feb 2002 (COD)

Combine Cycle

Nov 2002 (COD)

2

KL Sentral Electricity Distribution System and Chilled Water System Distribution Project

KL Sentral​

16,500 RT 

33 kV Distribution

1998 (COD)

3

Tanjung Bin Energy Power Plant Project

i. Power Block

ii. Cooling Water Intake & Outfall

iii. Interconnection Facilities

Pontian, Johor

1,000 MW

March 2012 – March 2016 (COD)

4

Tanjung Bin Power Conveyor Line 3 Project

Pontian, Johor

4,800 tonne/hr

Dec 2015 - May 2018

5

Tanjung Bin Energy New Coal Unloading Jetty Project

Pontian, Johor

4,800 tonne/hr

Apr 2017 – Mar 2019​

6

Tanjung Bin Energy Water Pipeline Project​

Pontian, Johor

8,000 m³/day

Jun 2016 – Apr 2017

7

ZEC Solar Large Scale Solar Plant Project

Kota Tinggi, Johor

29 MWac

Mar 2018 – Aug 2019 (COD)​

8

Rooftop Solar Projects with DRB, UMW and MMC Group of Companies (12 Sites)

Peninsular Malaysia

25 MWp

Q4 2020 – Q1 2022​